Find Engineering & Architecture RFPs in Colorado
56 active opportunities· Updated daily
| Title | Agency | Due Date | Set-Aside | Est. Value |
|---|---|---|---|---|
| Arapahoe County Facilities Master Planning | Rocky Mountain E-BidNet Purchasing System | 2026-06-04 | — | — |
| CU Boulder - UCB001162 - ECEE - Engineering Storefront Consolidation | Rocky Mountain E-BidNet Purchasing System | 2026-06-04 | — | — |
| Sanitary Sewer Alignment Mitigation Project | City of Englewood | 2026-06-04 | — | $500K |
| Solar Development Opportunities - Xcel Energy Territory | bids | 2026-06-04 | Minority Business Enterprise | — |
| CU Boulder - UCB001162 - ECEE - Engineering Storefront Consolidation | bids | 2026-06-04 | Minority Business Enterprise | — |
| Geotechnical Drilling NV Flap Was CR 34(1) County Road 34 | U.S. Department Of Transportation | 2026-06-05 | — | $110K |
| Heating Plant Boiler Upgrade – Design Services | Rocky Mountain E-BidNet Purchasing System | 2026-06-05 | — | — |
| Grand Lake CO Stormwater Plan Inplementation | Rocky Mountain E-BidNet Purchasing System | 2026-06-05 | — | — |
| WTF Pipeline Connections Design | Rocky Mountain E-BidNet Purchasing System | 2026-06-05 | — | — |
| Waneka Granary Structural Enhancement | Rocky Mountain E-BidNet Purchasing System | 2026-06-05 | — | — |
| Heating Plant Boiler Upgrade – Design Services | bids | 2026-06-05 | Minority Business Enterprise | — |
| Waneka Granary Structural Enhancement | bids | 2026-06-05 | Minority Business Enterprise | — |
| Glenwood Park Reconstruction Design | Rocky Mountain E-BidNet Purchasing System | 2026-06-09 | — | — |
| Conservation Gardens Renovation and Infrastructure Improvements | Rocky Mountain E-BidNet Purchasing System | 2026-06-09 | — | — |
| SCADA Master Plan | Rocky Mountain E-BidNet Purchasing System | 2026-06-10 | — | — |
| Design for South Broadway Signal Interconnect Improvements Phase II #25-37 | Rocky Mountain E-BidNet Purchasing System | 2026-06-11 | — | — |
| Stockbridge Overall Development Plan | Rocky Mountain E-BidNet Purchasing System | 2026-06-11 | — | — |
| Traffic Engineering Network Installation & Repair Services | bids | 2026-06-12 | Minority Business Enterprise | — |
| Traffic Engineering Network Installation & Repair Services | Rocky Mountain E-BidNet Purchasing System | 2026-06-12 | — | — |
| Maroon Creek Hydro Gravity Concrete Dam Structural Stability and Stress Analyses | Rocky Mountain E-BidNet Purchasing System | 2026-06-12 | — | — |
Showing 20 of 56 results.
Sign up to see full details, source documents, and AI analysis →
Tips for Winning Engineering & Architecture Contracts in Colorado
- ✓The SF330 (Architect-Engineer Qualifications) form is the standard submission format for all federal A/E procurements. Master this form — it requires detailed project descriptions, key personnel qualifications, and organizational charts specific to each opportunity.
- ✓IDIQ (Indefinite Delivery/Indefinite Quantity) and MATOC (Multiple Award Task Order Contracts) are the primary vehicles for A/E services. Winning a spot on an IDIQ provides a multi-year pipeline of task orders.
- ✓Professional Engineer (PE) and Registered Architect (RA) licenses in the state where work will be performed are typically required. Many proposals require specific subconsultant specialties — build relationships with geotechnical, structural, and MEP firms for teaming.
Engineering & Architecture RFP FAQ
What is the Brooks Act and how does it affect A/E procurement?
The Brooks Act (40 U.S.C. §§ 1101–1104) requires federal agencies to select architect-engineer firms based on qualifications, not price. Firms submit SF330 forms demonstrating competence, then the most qualified firm negotiates a fair and reasonable price. If negotiations fail, the agency moves to the next-ranked firm. Most states have similar QBS laws for state-funded A/E work.
What is an SF330 and how do I submit one?
SF330 (Architect-Engineer Qualifications) is the standard federal form for A/E proposals. Part I covers project-specific qualifications: key personnel, relevant experience, project approach, and organizational chart. Part II is a firm-level overview filed separately. Strong SF330s emphasize specific relevant projects, named key personnel who will do the work, and clear project understanding.
How do IDIQ contracts work for engineering services?
IDIQ contracts establish a multi-year framework (typically 5 years) with a minimum and maximum dollar value. Once awarded, the agency issues individual task orders for specific projects. USACE, NAVFAC, and GSA all use IDIQ/MATOC vehicles extensively. Getting on an IDIQ is highly competitive but provides a steady pipeline of work without rebidding each project.
What certifications help win government engineering contracts?
PE (Professional Engineer) licensing is mandatory. SBE/DBE certification is valuable for DOT-funded work — states must meet DBE goals on federal highway projects. ISO 9001 quality management certification is increasingly requested. LEED accreditation helps for sustainable design projects. Security clearances are needed for DOD/intelligence facility design.
Other categories in Colorado
Engineering & Architecture RFPs in other states
Get Alerts for Engineering & Architecture RFPs in Colorado
Stop checking procurement portals manually. BidSparq delivers AI-matched engineering & architecture opportunities straight to your inbox.
Start Free Trial →